You are now in the main content area
Grid-connected utility-scale battery facility
Testing large-scale urban energy storage on campus
The Centre for Urban Energy has an outdoor facility connected to the 13.8 kilovolt (kV) Toronto Hydro grid and can test units in megawatt (MW) scale. The facility is monitored and controlled by a utility-grade supervisory control and data acquisition (SCADA) system via a fibre-optic link.
Next steps: